When you need one
The owner needs a valid EPC before selling or letting a home, and should show the rating in adverts and give the certificate to the buyer or tenant. New buildings need one on completion.
Who issues it and what it costs
A registered assessor visits the home and records the walls, roof, windows, water heating and air conditioning. The certificate is lodged with the Building and Construction Authority, which charges a registration fee. Assessors set their own fees; most homes come to about €150 to €250 in total.
How long it lasts
An EPC is valid for ten years, unless the home is changed in a way that affects the rating.
Reading the rating
A is best, G is worst. In Malta the biggest gains usually come from roof insulation, double glazing, a solar water heater or heat pump, and efficient air conditioning. Higher-rated homes cost less to cool in summer, which matters more each year. See ARMS for electricity tariffs.
If you are renting or buying
Ask for the EPC. It is a quick way to judge summer and winter bills before you sign, and the seller or landlord is the one who must provide it.
